May 18, 2008

Bandra Worli Sealink

bandra worli sealink construction cables and wires mumbaiThe 5.6 km long Bandra Worli sealink is progressing to be ready to take traffic from January 2009. Here is a stunning picture of the cables used to support spans of the bridge. The total length of the cables and wires used to construct it is equal to the circumference of the Earth.

That is good news for the Mittals and Tatas -- the steel barons.